REGIONAL PLANNING / ALBERTA
Sexsmith.
Match the test to the water authority.
A backflow assembly test and a cross-connection survey are different requests. For a Sexsmith property, identify the assembly, the purpose of the visit and the water authority receiving the report before booking work.
Contact FourPoint to confirm availability. This guide does not represent a local office, confirmed booking or municipal appointment.
01 / LOCAL CONTEXT
One assembly, one report, one clear purpose
Start with the previous test report and the assembly’s make, model, size and serial number. A request to test an existing assembly does not automatically include a survey of the whole building, selection of a replacement assembly or verification of every potential hazard. If you have received a utility notice, keep the original wording and due date with the enquiry. FourPoint’s availability and suitability for the requested work must be confirmed; this page does not claim registration on any water authority’s approved-tester list.
02 / PREPARE THE WORK
A practical enquiry path.
Read the notice
Determine whether the request concerns a test, missing report, survey, repair or installation. Send the relevant notice privately with the equipment details.
Check the accepted qualifications
Confirm the current tester-registration, equipment and reporting conditions with the water authority. A trade title alone does not establish program approval.
Agree on the deliverable
Ask who receives the report, how deficiencies are communicated and what requires separate authorization if a test cannot be completed or an assembly needs attention.
03 / THE SITE BRIEF
Bring the useful details.
- The utility notice and report recipient, with private account information removed from any public upload.
- Assembly identification and the latest available test record.
- Whether the same visit also involves a private hydrant, and which work has separate authorization.
Share sensitive drawings, infrastructure locations and access instructions only through an agreed private process. This website is not an emergency reporting channel.
Questions before you book.
Is FourPoint listed as an Aquatera-approved tester?
This website does not claim that status. Confirm current registration and qualifications for the requested work with the authority and FourPoint before booking.
Does a successful assembly test replace a survey?
No. A test evaluates an identified assembly within its agreed scope; a survey examines cross-connection hazards and required protection more broadly.
04 / TECHNICAL CONTEXT
Guidance for the actual equipment.
Backflow prevention testing
Explore scope, technical context and questions to ask before arranging work.
Read the service guide →Cross-connection control
Explore scope, technical context and questions to ask before arranging work.
Read the service guide →Private fire hydrant maintenance
Explore scope, technical context and questions to ask before arranging work.
Read the service guide →05 / CONFIRM THE NEXT STEP
Discuss your Sexsmith site.
Confirm availability, the appropriate qualifications, travel and the proposed scope with FourPoint before work is arranged. A quotation does not replace permits or an authority’s approval.
Prepare a regional enquiry ↗Online delivery remains disabled: the enquiry form prepares a draft and clearly tells you that nothing was sent.
